Deltek Facilities presented a distinct challenge. A comprehensive commercial washroom and M&E upgrade delivered within a live working environment. Appointed by Axis@work, Synergy Group Solutions was tasked with modernising the ground and first-floor facilities, moving away from outdated infrastructure to a system designed for reliability and user comfort. Unlike a standard refurbishment, this project required meticulous coordination to strip out old units and integrate new mechanical and electrical systems without disrupting the building’s daily operations.
Modernising Infrastructure for Efficiency & Compliance With the existing layout in place, our team had to adapt, removing aged water heaters and sanitary ware while ensuring new pipework and cabling integrated seamlessly with the building’s fabric. This was a precision-led operation, requiring technical expertise and careful planning to ensure the new 15L Ariston units and 9kW shower system functioned flawlessly from day one.
Comprehensive M&E & Sanitary Installation For this commercial upgrade, Synergy delivered a full suite of installations, including:
Water Heater Replacement – Removal of 6 outdated units and installation of new, high-efficiency 15L Ariston heaters with PRVs for safety.
Sanitary Ware Installation – Supply and fit of all new sanitary ware, including first-fix kits and final connections as per architectural drawings.
Electrical & Power Adaptations – Installation of new power supplies and cabling to support a 9kW shower and modernised layout.
Lighting Upgrade Allowance – Replacement of existing fixtures with energy-efficient LED downlights to enhance the facility’s aesthetic.
This project was a benchmark for commercial compliance, demonstrating our ability to deliver turnkey M&E solutions that improve both building performance and user experience. The success of the Deltek Facilities upgrade highlights Synergy’s commitment to quality, reliability, and delivering modern standards for our commercial clients.