London HQ appointed Synergy Group Solutions to carry out comprehensive upgrades to their toilet and changing room facilities, delivering a B1 plumbing and electrical package in line with strict specifications. The primary objective was to modernise the existing spaces, moving away from standard utility to a high-specification environment that prioritised user experience, hygiene, and energy efficiency.
Modernising Commercial Infrastructure This project went beyond a simple refurbishment. It required the careful integration of premium sanitary ware and intelligent lighting solutions to create a clean, contemporary aesthetic. Our team managed the removal of existing fixtures and the installation of new concealed services, ensuring a sleek finish that adhered to current drawings and compliance standards.
Premium M&E & Washroom Scope Synergy delivered a coordinated mechanical and electrical scope, featuring:
Premium Sanitary Ware – Supply and installation of new concealed WCs and wall-mounted sinks with concealed mixers, chosen for their durability and minimalist design.
Accessibility Compliance – Installation of a new, fully compliant Doc M premium suite, ensuring the facilities remain accessible to all users without compromising on style.
Lighting Upgrades & Control – Replacement of dated vapour fittings with sleek black linear LED fittings and round LED panel lights. To enhance building efficiency, PIR sensors were incorporated throughout, significantly reducing unnecessary energy usage.
High-Spec Accessories – Installation of wall-mounted black toilet seat cover dispensers and modern hand dryers, complete with all required local power spurs.
These works transformed the London HQ facilities into modern, high-spec environments. By combining durable materials with improved lighting and efficient services, Synergy demonstrated its ability to elevate the functionality and design of commercial spaces through precise M&E contracting.






















